Solar Power Systems Not Works Contracts: Supreme Court Sets Aside Pre-2019 GST Demand on 70:30 Split

M/s. Sterling and Wilson Pvt. Ltd. v. Union of India and others 2026 INSC 1222 Decided 16 November 2026

Published: · NyayVidhan · 3 min read

In M/s. Sterling and Wilson Pvt. Ltd. v. Union of India and others (2026 INSC 1222), the Supreme Court held that the 70:30 goods-services split for solar power generating systems applied only from 01.01.2019, and that Circular No. 163/19/2021-GST merely gave assessees an option to use it for earlier supplies. Supply and installation of these detachable systems was not a works contract. It set aside the CGST order of 17.01.2025 and the Summary Order of 24.01.2025 (paras 33, 36, 39-40).

Solar Power Systems Not Works Contracts: Supreme Court Sets Aside Pre-2019 GST Demand on 70:30 Split

Judgment Intelligence

Petition Allowed
M/s. Sterling and Wilson Pvt. Ltd. v. Union of India and others
2026 INSC 1222
Civil Appeal No. 14228 of 2026 (arising out of SLP (C) No. 23844 of 2025)
Court
Supreme Court of India
Date of Decision
16 November 2026
Bench
Justices Sanjay Kumar and Sanjeev Sachdeva
Relevant Acts & Sections
Central Goods and Services Tax Act, 2017 — Sections 2(30), 2(119), 9(1), 74, 122(2)(b) and 168; Schedule II, Note 6; Notification Nos. 1/2017, 11/2017, 24/2018, 27/2018 and 8/2021-Central Tax (Rate); Circular No. 163/19/2021-GST dated 06.10.2021
Final Outcome

Appeal allowed. The Joint Commissioner's order of 17.01.2025 and the consequential Summary Order of 24.01.2025 of the Superintendent of Central Tax are set aside; parties bear their own costs (para 40).

Source Supreme Court of India, www.sci.gov.in — judgment dated 16 November 2026 · Court's copy

Key holdings

  1. An alternate remedy is not a straitjacketed bar; arguable points in a writ petition warrant consideration (para 5).
  2. The 70:30 split for SPG systems applies from 01.01.2019; for earlier supplies the Circular only gave an option (paras 33, 39).
  3. Supply and installation of detachable SPG systems on a civil foundation is not a works contract (paras 35-36).
  4. Section 74's extended limitation could not be invoked for applying a ratio that did not then exist (para 34).
  5. The Court held the Andhra Pradesh High Court's consistent view on SPG systems to be correct (para 36).

Judgment digest by NyayVidhan: a summary of the court's judgment, not its text. The judgment itself is the authoritative version.

Brief Facts

The appellant supplies and installs solar power generating (SPG) systems on a turnkey EPC basis and, for 01.07.2017 to 31.12.2018, paid tax at 5% treating them as goods under Serial No. 234 of Notification No. 1/2017 (paras 6, 18). After a show cause-cum-demand notice of 29.03.2023, the Joint Commissioner, CGST, Thane held on 17.01.2025 that the supply was a works contract taxable on the 70:30 split, found wilful suppression, invoked Section 74 and imposed penalty; a Summary Order of 24.01.2025 followed (paras 17-18). In effect ₹53,35,80,964/- was demanded (para 2). On 28.07.2025 the Bombay High Court dismissed the writ petition, citing the alternate remedy (paras 2-3).

Court's Findings

The Bench held that the cursory dismissal of the writ petition was not justified: arguable points were raised, and an alternate remedy is not a straitjacketed formula. As the matter was heard at length and the Andhra Pradesh High Court had already decided the issue, it decided the merits itself (para 5). Notification No. 24/2018, which brought in the 70:30 split, took effect from 01.01.2019 with no retrospective operation (paras 11, 33). Circular No. 163/19/2021-GST said tax ‘can’ be paid on that split for earlier supplies; this was only an option, and treating it as a mandate for all assessees was patently erroneous (paras 17, 33). As the ratio did not exist in the earlier period, no fraud or suppression could be imputed, so extended limitation under Section 74 was unsustainable, as Tata Steel also requires (para 34). Civil works in the EPC contract did not make it a works contract: the panels can be detached and used elsewhere, and the foundation only keeps the system stable (paras 35-36). The later change of the entry to ‘solar power generator’ could not apply retrospectively (para 38).

Legal Principle

A composite supply is a works contract under Section 2(119) of the CGST Act only if it relates to immovable property as the end product. Solar power generating systems fixed to a civil foundation for stability, which can be detached and used elsewhere, are not immovable property, and a circular's option cannot be enforced as a mandate (paras 33, 36).

NyayVidhan's view · Practice note

Why It Matters

Suppliers who paid 5% on whole solar power generating systems for July 2017 to December 2018 can rely on this ruling: for that period the 70:30 split was an option for the assessee, not a mandate for the department (paras 33, 39). Any works-contract claim must turn on the facts and the immovable-property tests, and Section 74 needs foundational facts of suppression (paras 34, 36). The ruling also shows that a writ court may examine a tax demand that raises arguable points instead of relegating the assessee to an appeal with pre-deposit, as each case turns on its own facts (paras 3, 5).

Editorial comment by the NyayVidhan Editorial Desk. It is not part of the Court's judgment and is not legal advice.

Precedents Relied Upon

  1. Sterling and Wilson Pvt. Ltd. v. Joint Commissioner, State Tax, Vijayawada (2025) 26 Centax 301 (A.P.)
    Relied Upon Discussed at ¶ 19, 28, 36

    Andhra Pradesh High Court (Division Bench, 10.01.2025), in the appellant's own case: an SPG system merely attached to an embedded civil foundation is not immovable property, so its supply and installation is not a works contract under Section 2(119) of the CGST Act. The Revenue did not challenge it, and the Supreme Court held the consistent view of that High Court to be the correct view.

  2. TTG Industries Ltd., Madras v. Collector of Central Excise, Raipur (2004) 4 SCC 751
    Referred To Discussed at ¶ 25, 29

    Machinery erected at a purchaser's site was treated as immovable property because it could not be shifted without dismantling and re-erecting it; its permanency test was later distinguished in Bharti Airtel.

  3. Commissioner of Central Excise, Ahmedabad v. Solid and Correct Engineering Works (2010) 5 SCC 122
    Relied Upon Discussed at ¶ 25, 26

    A machine fixed by nuts and bolts to a foundation for wobble-free operation, without intent to attach it permanently to the earth, is not immovable property; part of the law the Court applied to SPG systems.

View all precedents (11)
  1. Sirpur Paper Mills Ltd. v. Collector of Central Excise, Hyderabad (1998) 1 SCC 400
    Referred To Discussed at ¶ 26, 27

    Plant and machinery fixed in the earth for better functioning do not automatically become immovable property.

  2. Duncans Industries Ltd. v. State of U.P. (2000) 1 SCC 633
    Referred To Discussed at ¶ 27

    Plant and machinery permanently embedded for running a factory formed part of the immovable property conveyed; whether embedded machinery is movable depends on the facts and the intention of the parties.

  3. Bharti Airtel Limited v. Commissioner of Central Excise, Pune (2024) 19 SCC 1
    Relied Upon Discussed at ¶ 29

    Mere attachment to the earth does not make an article immovable; six tests (nature and object of annexation, intendment of the parties, functionality, permanency and marketability) decide the nature of the property.

  4. M/s. Siemens Gamesa Renewable Power Private Limited v. The Assistant Commissioner ST, Kavali Circle, Nellore 2025 (12) TMI 1888
    Referred To Discussed at ¶ 29, 30

    Andhra Pradesh High Court: wind turbine generators erected on foundations are movable goods, so their supply and installation is not a works contract.

  5. The Assistant Commissioner, ST v. M/s Siemens Gamesa Renewable Power Private Limited 2026 (8) TMI 847 (SC)
    Referred To Discussed at ¶ 30

    The Supreme Court dismissed the Revenue's challenge to the Andhra Pradesh High Court's wind turbine ruling, finding no grounds to interfere.

  6. M/s. Arka Green Power Private Limited v. The State of Andhra Pradesh Writ Petition No. 11989 of 2022 and batch, decided on 24.12.2025
    Referred To Discussed at ¶ 31

    Andhra Pradesh High Court: mere attachment of solar power pumping systems to a base does not make them immovable property; it followed its decision of 10.01.2025 in the appellant's case.

  7. M/s. Rudraksha Allied Chemicals Pvt. Ltd. v. Ordnance Factory, Itarsi Writ Petition No. 29929 of 2025, decided on 22.05.2026
    Distinguished Discussed at ¶ 32

    Madhya Pradesh High Court tender case on whether a work was a works contract for a particular policy; the Revenue's reliance on it was held wholly misplaced, as it arose in a totally different factual and contextual milieu.

  8. Relied Upon Discussed at ¶ 34

    Extended limitation for fraud, wilful misrepresentation or suppression needs foundational facts evident from the notice itself; mere use of those words does not show application of mind.

Join our WhatsApp Group
✕

Try: POCSO, IBC, Electoral Bond, Article 370, NDPS Act, Bail Conditions, SC Contempt